Solar panels under an Alberta sunrise, the original Raydn homepage imagery

Raydn Renewables · Edmonton, Alberta

Your electrician.
For more than solar.

From a switch that needs replacing to a whole building that needs wiring. We’re a full electrical company, led by a Master Electrician.

5.0 from 75 Google reviews

Edmonton, Spruce Grove, St. Albert, Sherwood Park, Beaumont, Leduc, Stony Plain, Fort Saskatchewan

Dmitry NabokaDmitry NabokaOwner · Master Electrician #13824

Tell us what you need

Send the details and you get an answer the same day, or first thing next morning, from a Master Electrician. No call centre, no sales rep.

Photos help us quote without a site visit. Text them to (780) 904-3462 after you send this, or reply to the email that comes back.

You get a Master Electrician, not a sales rep. Dmitry Naboka, Master Electrician #13824. No subcontractors on your site.

Would rather talk it through? Call (780) 904-3462, or browse the services first.

What can we help with?

Start with your project.

You can call us for a few switches, not just the big jobs.

Just a few things around the house?

Yes, we do those too. Send the whole list so we can plan the visit.

Fixture swaps: $120 per fixture plus materials. That is fixture swap pricing, not a service call rate. See service call pricing.

Two taps, a real number

What is this going to cost me?

Tap what you need. You get the real number where I have one, a straight answer where I do not, and nothing gets emailed.

Every number above is already posted on the page it links to. Two lanes show no number on purpose, because lighting is priced off a measured fixture count and backup power is a new line for me. Materials are named before they are bought, and you get a firm number in writing before I start.

Get my price

Sky panels for drop ceilings

Winter’s grey. Your ceiling doesn’t have to be.

LED sky panels go into a regular 2x2 drop ceiling, in the same openings the old flat panels sat in. Offices, basements, any dull room with a grid ceiling. I’ll tell you at the walkthrough whether yours takes them.

See all three rooms ↗
The same home office with two LED sky panels in the drop ceiling showing blue sky A home office in Edmonton before the work, lit by two flat 2 by 2 LED panels in a drop ceiling BeforeAfter

Same office. Same ceiling grid.

Two flat 2x2 panels came out and two Feit Vista sky panels went into the same openings. No drywall. Tap the wall switch for sky, plain white light, or both.

Get my price

Named before you buy

The equipment that actually goes in

A quote that only says quality materials is a quote that can swap them for something cheaper. Tap a category to see the brands I install and who holds the warranty.

Panels and inverters

    Six steps, nothing hidden

    What actually happens after you send it over

    Tap any step. You get who does it, when it happens and what it costs, so nothing on install day is news to you.

    Step 1 of 6

    Who does it
    When
    What it costs

    Six things you can check

    What you are actually paying for

    Every line here is something you can verify before you pay me a dollar. Tap one to see how.

    Dmitry Naboka, Master Electrician, licence number 13824, 14 years in the trade. Ask any contractor for a licence number and check it before you pay a deposit. Ours is on every quote, every permit and the bottom of every page on this site.

    The permit is what makes the work legal and insurable, and it is what gets asked for when you sell. It is filed before the work starts, under our own licence, and it is priced as its own line so you can see exactly what it cost.

    Five people, all Raydn, since August 2025. The crew that quotes the job is the crew that builds it. Kyle Verbeek, co owner and Journeyman, carries 20 years on the tools.

    Model numbers on the quote. A NEMA 14-50 receptacle, a Wallbox Pulsar Plus, a DCC controller, a 200 A panel. You can look every one of them up. A quote that only says quality materials is a quote that can swap them for something cheaper.

    The price you sign is the price you pay. If a wall opens and the job is genuinely bigger, work stops and you hear the new number before I carry on. You are never finding out at the invoice.

    On our labour, in writing. On solar work the hardware carries its own manufacturer cover on top, 25 years on the panels and 25 years on the microinverters.

    Get my price

    Dmitry Naboka, Raydn co-owner and Master ElectricianDmitry Naboka
    Owner & Master Electrician

    The person behind the company

    I’m Dmitry.
    I’m on the tools too.

    I’m a Master Electrician and co-owner of Raydn. We do the everyday electrical work, the bigger upgrades and the solar. You don’t need a roof full of panels to call us.

    From the existing job gallery

    Let the work show you.

    See the full gallery ↗
    The new Leviton smart panel in the same spot The old grey electrical panel before the upgrade BeforeAfter

    Old panel out, Leviton in.

    Same spot on the wall. A 66 space Leviton with 37 smart breakers. Two of us, two full days.

    See the whole Leviton job ↗

    Why we do it the right way

    The TV quit. The outlet behind the couch was melting.

    The problem was not the TV outlet. It was one further up the line, behind the curtains and the couch, where nobody would ever look. It had been wired the quick way.

    The outlet pulled from behind the couch, its screws dark from heat and the plastic around them meltedBehind the couch

    Melting, inside the wall.

    Heat turned the screws dark and melted the plastic around them, right by the curtains.

    Heat like this inside a wall is a fire risk.

    An old outlet pulled from the wall, its wires pushed into clips in the back instead of wrapped around the screwsThe quick way

    Pushed into the back to save time.

    • Wires pushed into small spring clips in the back, instead of wrapped around the screws.
    • Every outlet after it on the circuit is fed through those clips.
    • When a clip works loose it runs hot, inside the wall, where nobody sees it.
    The same box redone, the wires joined with connectors and short leads wrapped around the screws of the new outletHow we do it

    Wrapped around the screw and tightened down.

    • Wires joined in the box with connectors, so the circuit never runs through the outlet.
    • A short lead to the outlet, wrapped around the screw and checked tight.
    • If an outlet ever fails, everything after it keeps working.

    The same box, before and after we redid it.

    It takes longer. We do it anyway, on every job, panels, chargers and solar included. Doing it right once beats finding it melted behind a couch.

    Outlet dead or warm? Start here ↗

    Get my price

    No need to know the trade terms

    Tell us what you need.

    Tell us what needs doing and where.

    1. Show us the job

      What needs doing and where.

    2. Agree on the work

      We confirm the scope and pricing.

    3. Book the visit

      Pick an agreed time for the work.

    Looking for solar or a larger project? Choose the service above for the right next step.

    5.0 Electrical, lighting, solar & EV
    Send a work request Call Raydn