Alberta Solar True-Cost Worksheet
Every line item in an Alberta solar quote, nothing hidden.
If a solar quote in Alberta only shows one big number, you cannot check the math. So here is the whole thing, opened up.
Every real cost in a residential install
What a fair range looks like in 2026
The four edge-case items that surprise homeowners after they sign
Use it to grade any quote, including ours.
Written by Raydn Renewables · Master Electrician owned and operated · licence #13824 · CEIP-02428 · Last updated July 2026.
5.0 on Google · 70+ verified reviews
What solar customers say
These are Google reviews, copied word for word. Real Alberta solar jobs, real names, nothing edited.
Swipe sideways for 1 more →
The worksheet
What actually goes on a residential solar invoice in Alberta
Below is every line item that should appear on a proper Alberta residential solar quote in 2026.
Ranges are for a typical 6 to 10 kW rooftop install
Edmonton or the surrounding capital region
Bigger systems, acreages, and battery-added jobs move the numbers, not the categories
1. Panels
$0.45 to $0.65 / wattWhat to check
Tier-1 modules (Q CELLS, Canadian Solar, Silfab, REC, Trina) with 25-year manufacturer warranty. Higher wattage or all-black cosmetic panels sit at the top of the range. Beware anything below $0.40 / watt in 2026, it usually means off-brand modules or grey-market inventory.
2. Inverter or microinverters
$0.35 to $0.55 / wattWhat to check
Enphase IQ8 microinverters (25-year warranty, per-panel monitoring) sit at the top of the range. A single string inverter (Fronius, SolarEdge, EG4) is cheaper up front, cheaper to replace, but a single point of failure. Both are legitimate choices. Raydn defaults to Enphase for most residential jobs because the shading and MPPT tradeoffs favor micros in Edmonton.
3. Racking, flashings, wiring, DC and AC hardware
$0.30 to $0.45 / wattWhat to check
IronRidge or Unirac rails, waterproof roof flashings at every penetration, MC4 connectors, EMT conduit, wire, DC disconnect, rapid-shutdown box, AC combiner. This is where the "10-year rack and roof-penetration warranty" comes from. If the price here looks low, ask what flashings are being used.
4. Install labor and project management
$0.60 to $0.90 / wattWhat to check
This is where corner-cutters cut. A proper crew is 3 to 4 tradespeople on the roof for a full day plus a Master Electrician of record signing off the AC tie-in. It also includes design, layout, engineering coordination, permit submission, inspection scheduling, and warranty paperwork registration. If someone is quoting well below $0.55/W here, they are either 1099'ing casual laborers or skipping design steps.
5. Engineering stamp (APEGA)
$0 to $600 flatWhat to check
Required by most Alberta municipalities for the structural side of the roof-mount install. Some smaller systems on truss-rated roofs skip it; anything on rafters, on a commercial roof, or over ~10 kW almost always needs it. Not optional if the city asks for it.
6. City electrical permit
$150 to $300 flatWhat to check
Edmonton and each surrounding municipality (St. Albert, Spruce Grove, Leduc, Sherwood Park) set their own fees, but a residential solar permit lands in this range for most sizes. It pays for the city inspection of the AC side of the system.
7. ESA / Alberta Safety Codes permit
$120 to $220 flatWhat to check
Provincial electrical permit filed under the Master Electrician of record. Verifies that the whole install meets the current Canadian Electrical Code. Without this on file, the utility will not activate your system.
8. Utility bidirectional meter change
~$150 flat (EPCOR)What to check
EPCOR (or FortisAlberta, ENMAX, ATCO depending on your address) swaps your existing meter for a bidirectional model that reads both consumption and export. Fee is set by the utility, not the installer. Once installed, your microgen goes live.
9. Microgeneration application
$0 (installer files it)What to check
Filed by your installer with EPCOR / FortisAlberta / your local wire owner. No fee, but the paperwork is real and slow. If you see a "microgen filing fee" on a quote, that is markup, not a real cost. See our EPCOR microgen guide for the process.
10. ARMA solar recycling fee new Oct 1, 2026
$15 per panel (was $14)What to check
Province-wide environmental fee administered by Alberta Recycling Management Authority. On a 22-panel job that is $330. It is a pass-through, not a Raydn markup. Full explainer: Solar Recycling Fee Explained.
11. Monitoring hardware and commissioning
Included, no extra lineWhat to check
Enphase Envoy gateway (or SolarEdge equivalent), wifi setup, panel-level monitoring app, first-run commissioning. Every legitimate Alberta installer bundles this. If you see it as a separate fee, ask what it covers.
Ranges reflect Edmonton and capital region 2026 pricing. GST is added on top and shown as its own line on the invoice. Nothing above is a Raydn-invented category. Every line has a real recipient outside of us.
Sample math
A real 8 kW Edmonton rooftop, built line by line
System: 20 panels, 400 W each = 8.0 kW DC. Enphase IQ8 microinverters. Rooftop asphalt shingle. Standard 200 A service, no upgrade needed. No shading obstructions, no roof repair. City of Edmonton address, EPCOR service territory.
| Panels (20 × 400 W tier-1) | $4,400 |
| Enphase IQ8 microinverters (20) | $3,600 |
| Racking, flashings, wire, disconnects | $2,900 |
| Install labor and project management | $5,800 |
| APEGA engineering stamp | $450 |
| City of Edmonton electrical permit | $220 |
| ESA / Alberta Safety Codes permit | $180 |
| EPCOR bidirectional meter change | $150 |
| EPCOR microgeneration application | $0 |
| ARMA recycling fee (20 × $15, from Oct 1) | $300 |
| Subtotal, all-in | $18,000 |
| GST (5%) | $900 |
| Total delivered | $18,900 |
That is $2.36 per watt DC all-in before GST, $2.48 per watt including GST. Booked before October 1, 2026 the ARMA line drops off and the total sits about $300 lower.
Numbers are representative, not a personal quote. Your job will differ by roof pitch, panel count, inverter choice, and utility. Every real Raydn quote lists these same categories on the invoice so you can spot-check every one.
The four things that surprise people
Costs a proper site assessment flags before you sign
Some homes need them. Some do not.
An installer skips the site assessment, signs you at a low number, then surprises you with them later.
Any of the four below should show up in your assessment notes with a price range, or be explicitly ruled out.
1. Panel upgrade to 200 A
$2,500 to $4,500
Why it happens
Typical when solar is the reason. Full range across all panel work is $2,200 to $6,500 and up. If your home is on 100 A service, most systems above 6 kW will require a panel upgrade. We check the main breaker at the assessment, not after.
2. Tree trim or removal
$300 to $1,500
Why it happens
One shading tree can knock 15% off your annual production. If it needs to go, it needs to go before install. We flag it, you decide.
3. Roof repair or shingle replacement
$3,000 to $12,000
Why it happens
We will not put racking on shingles that will fail inside our 10-year rack warranty. If your roof is near end-of-life, we say so before you buy panels.
4. EPCOR transformer upgrade
Utility-priced, varies
Why it happens
Rare, but on older streets EPCOR occasionally flags the pole transformer as too small for your export. We run the microgen application early so this surfaces before install day.
If a competitor's quote skips the site assessment or hands you a number without walking your roof and opening your panel, treat the price as a placeholder, not a commitment. See our Solar scams guide for the full list of warning signs.
Grade any quote against this page
Get a quote that lists every one of these lines, or ask us why one is missing.
See if your roof math even makes sense.
We hand you an itemized quote you can compare against this page, line by line.
Master Electrician owned and operated · licence #13824 · CEIP-02428 · 14 years on the tools, with 50+ completed jobs and 60+ kW of solar across Alberta since we opened in August 2025.
Master Electrician, 14 years on the tools, and my own roof has been running since 2022. Every system on that list was designed, wired, and signed off by the owner personally.
Where these numbers come from
The sizing rule and who reviews the application come from the Alberta Utilities Commission, Micro-generation frequently asked questions, read 27 August 2026. The AUC states a micro-generation unit is meant to meet all or a portion of the customer’s total annual energy consumption, and that the distribution facility owner evaluates the application.
The 6.0 percent CEIP rate, the $3,000 to $50,000 residential range, and the term cap all come off the City of Edmonton page for the program, Clean Energy Improvement Program, read 27 August 2026. The city publishes it as the rate for the current tranche, and it is fixed for your whole term once your agreement is in place. The city also caps the term at the lesser of 20 years or the useful life of the upgrades.
Every rate on this page is a published third party figure or is labelled as our own estimate. If one of these has moved since the read date, tell me and I will correct the page.